3 Days Saved and 30% Reduction in Connection Times in Offshore Mexico Well

Optimizing Performance in Complex Offshore Conditions

In Mexico, an offshore operator needed faster well delivery while drilling through interbedded formations with high vibrations and reaming challenges. Baker Hughes and Corva partnered to design a multiple-BHA approach supported by advanced analytics, enabling real-time monitoring, hazard prevention, and performance benchmarking.

Key Results & Value Delivered

Corva and Baker Hughes combined cutting-edge tools and real-time insights to reduce delays, improve efficiency, and deliver measurable cost and time savings, resulting in:

  • Being 3 days ahead of plan, accelerating well delivery
  • Saving 36 hours versus operator goal
  • A 30% reduction in weight-to-weight time compared to a 15-minute average
LATEST UPDATES

Explore Our Other Case Studies