33% ROP Gain and Zero HSE Incidents Achieved with 3D Visualization

Driving Precision and Safety with Advanced Visualization

A Middle East operator faced severe vibrations, instability, and trajectory challenges while drilling near the reservoir roof. By partnering with Corva and Baker Hughes, their team applied advanced 3D visualization, precision steering, and real-time advisory support to optimize well placement, enhance performance, and maintain the highest safety standards.

Key Results & Value Delivered

By combining advanced visualization with real-time analytics, the team achieved significant drilling gains while maintaining the highest safety standards.

  • 33% increase in ROP compared to prior wells
  • 10% reduction in weight-to-weight times
  • 100% pay zone exposure with optimal well placement
  • Zero HSE incidents during well construction
LATEST UPDATES

Explore Our Other Case Studies